Snag list
#1
red
red
Ceiling tile missing above reception desk
Drawing A-101 - assigned to Ceilings contractor
Drawing A-101 - assigned to Ceilings contractor
Open
#2
amber
amber
Power outlet not labelled in boardroom
Drawing A-101 - assigned to Electrical contractor
Drawing A-101 - assigned to Electrical contractor
Awaiting Site Manager
#3
green
green
Door closer requires adjustment
Drawing A-101 - assigned to Joinery contractor
Drawing A-101 - assigned to Joinery contractor
Verified / closed